What you will achieve
- Draw an area containing only the intended nodes.
- Distribute and verify the assigned demand.
Step-by-step tutorial
How to allocate demand with Thiessen polygons
Define the study area, distribute a total demand, and review which nodes were included.
Before you start
- Load the network and locate demand nodes.
- Define the total demand and its unit before drawing.
Define the study area
Enable Thiessen and draw a closed polygon around participating nodes. The boundary does not need to cover elements intentionally left outside.
- Zoom near the boundary to avoid accidental inclusion.
- Check the node count before continuing.
Enter the total demand
Enter the total to distribute and run the allocation. WatDis distributes demand according to the influence areas of included nodes.
- Confirm the displayed unit.
- Keep the original total to verify the allocation.
Review the result
Select several nodes or open the table to compare resulting demands. The included-node values should relate to the total according to the applied method.
Do it in WatDis
- Draw a polygon leaving one control node outside.
- Allocate a known total demand.
- Verify the included set and its demands.
Common mistakes
Closing without checking nodes
A nearby boundary can include or exclude a different node than intended.
Confusing the polygon with the whole network
The tool acts on nodes inside the polygon, not necessarily every visible node.